Finished Projects

The program of development in power generation branch in the Republic of Kazakhstan is prepared. At the moment a search of investor is being carried…

 

Turbine Equipment

2019: supply of turbine spare parts for 100 MW and 30 MW steam turbines of the Russian turbine manufacturer for Inter RAO.

 

Compressor Equipment

2018: selection of main parameters, packaging company of screw gas compressor for gas turbine test bench of PAES-2500 model, Motor Sich factory, Moscow region.

 

Boiler Equipment

2014: selection of main equipment, boiler parameters, data preparation for the project design company. Eight once through steam generators EN-Fab with steam pressure 12,8…18,0 MPa, 24 ton/hour.

 

2013: cogeneration mini power plant of Cheliaboblkommunenergo, the city ok Kopeisk.
Project supervision and commissioning of the single gas genset Guascor SFGM-560 (Siemens SGE-56SM) with electrical power 1025 kW each with the heat recovery system. The genset operates in parallel with the electrical grid without energy export.

2012: cogeneration mini power plant of meat processing factory Telec, the city of Kungur, Perm region.
Project supervision and commissioning of the three gas gensets Guascor SFGLD-180 (Siemens SGE-18SL) with electrical power 303 kW each with the heat recovery system. The gas gensets of container type, packaging in container was done in Perm region.

2012: cogeneration mini power plant of ENERGY ENGINEERING STRUCTURES PLANT in the city of Yuzhnouralsk, Chelyabinsk region. Project supervision and commissioning of the three gas gensets Guascor SFGLD-560 (Siemens SGE-56SL) with electrical power 956 kW each with the heat recovery system.

2011: cogeneration mini power plant of Grand Hotel Vidgof, city of Chelyibinsk. Project supervision and commissioning of the two gas generator sets Guascor SFGLD-360 (Siemens SGE-36FL) with electrical power 610 kW each with the heat recovery system. The gensets are able to work in parallel with the electrical grid without energy export.

Project supervision and commissioning of the two gas gensets Guascor FGLD-360 (Siemens SGE-36FL) with electrical power 530 kW each with the heat recovery system.

2011: cogeneration mini power plant of the Federal State Unitary Enterprise “Production Supply Enterprise of the Administrative Department of President of the Russian Federation”, Moscow region